We were involved with all the engineering work on this 126 house estate from 2000 onwards to completion. Our role included the overall site survey and setting out, the design of the surface water and foul sewers and inspecting open foundations. Also the ground conditions were in general good some peaty areas were encountered which involved removing the peat down to depths of up to 5m and replacing with infill concrete.